MechCrnBellSmM1940

Mechanical Crane & Vehicle Bells

With the increased awareness of factory safety, many crane users install bells on the moving cranes.

The W.L. Jenkins Company manufactures foot operated and automatic axle operated mechanical bells for cranes, rail cars and other vehicles.


FEATURES

Mechanical Crane and Vehicle Bells are available in seven different models:

  • Model 1492 – Foot Operated Mechanical Bell
  • Model 2300 – Foot Operated Single Tap Mechanical Bell
  • Model 1950 – Foot Operated Multiple Ring Bell
  • Model 1970 – Foot Operated Multiple Ring Bell
  • Model 1940 – Axle Bell – Automatic Ring
  • Model 1990 – Rotary Multiple Ring Bell
  • Model 2100 – Lever Action Mechanical Bell

APPLICATIONS

The W.L. Jenkins Mechanical Bells can be used in a variety of applications including:

  • Manufacturing Facilities steel mills, mining operations, refineries and foundries
  • Transportation ferries, amusement park rides, trolley cars and trams
  • Manufacturing overhead cranes, hoists, rail cars, tow motors and maintenance vehicles

 


MechCrnBellSmM1492Model 1492 – Foot Operated – Mechanical Bell
Model 1492 is a simple foot operated bell where the push foot knob is above the floor and the bell underneath the floor. The operator taps the foot knob which results in one ring for each tap.

  • Available in 8" and 10" steel gong shells

 


MechCrnBellSmM2300Model 2300 – Foot Operated – Single Tap Mechanical Bell
Model 2300 is a rugged single tap bell that operates with minimum head room. The bell rings each time foot push knob is operated. Most economical.

  • Available in 6", 8" and 10" steel gong shells

 



MechCrnBellSmM1940Model 1940 – Axle Bell – Automatic Ring
The model 1940 is designed to be mounted on the axle or wheel hub. Signals start with forward or backward movement of vehicle. Maximum operating speed is 70 RPM.

  • Available for 2" – 5" axles with a 6" gong shell
  • Available for 5" – 53/4" axles with a 12" gong shell

 


MechCrnBellSmM1950Model 1950 – Foot Operated – Multiple Ring Bell
Model 1950 is designed for limited space. The mechanism is entirely enclosed. The operator controls the bell ringing cycle from single stroke to 15 – 20 cycles for continuous ringing depending upon how often the foot push knob is depressed.

  • Available in 12" steel gong shell

 


MechCrnBellSmM2100Model 2100 – Lever Action – Mechanical Bell
Model 2100 is a manual operated multiple ring mechanical bell with a completely enclosed mechanism. The bell will ring 15 to 20 times with each pull of the lever. The lever automatically returns to ready position.

  • Available in 12" steel gong shell only

 


MechCrnBellSmM1990Model 1990 – Rotary – Multiple Ring Bell
Model 1990 is a double rotary belt driven bell. Signals start with forward or backward movement up to 80 RPM. Pulleys not included.

  • Available in 12" gong shell only

 



MechCrnBellSmM1970Model 1970 – Foot Operated – Multiple Ring Bell
Model 1970 is similar in construction to model 1950. It is designed to be mounted below the crane floor. The mechanism will ring the bell 20 times with each stroke of the foot push knob. There are no springs.

  • Available in 12" steel gong shell

 

Download PDF